Successful demolition at Ira Grivita – 2010

Grivita IRA Factory – The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days.

Location Bucharest
Status Completed
Service Demolitions
Division Apolodor Demolitions
Customer Factory IRA Grivita

The demolition was completed in January 2010 in conditions of maximum safety, without shocks, vibrations or heavy parts fallen from height. Throughout the works we intensively used a water jet in order to reduce the dust resulted from demolition.

The equipment used was a very large Liebherr R 954 excavator with a 28 m long jib and demolition hydraulic shears.