Demolition IRA Grivita

Location Bucharest
Status Completed
Service Demolitions
Division Apolodor Demolitions
Customer Factory IRA Grivita

The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days. The demolition and disposal works were completed in January 2010 in conditions of maximum safety, without shocks, vibrations or heavy parts fallen from height. Throughout the works there a water jet was intensively used to largely reduce the dust resulted from demolition.

For the demolition a very large Liebherr R 954 excavator with a 28 m long jib and demolition hydraulic shears were used.

The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days.