Corugea Wind Farm. See amazing pictures.

Apolodor performed civil construction works, foundations and road for the 35 wind turbines of the farm. During the works, which lasted almost 7 months, we used numerous equipments (130 tones crane, backhoe loaders, excavators, trucks, drilling machines), together with a team of 200 members.