Autor: naty

  • The Underground Passage at Piata Presei Libere is completed

    Piata Presei Libere Passage – The Underground Passage at Piata Presei Libere is completed.

    Location Bucharest
    Status Completed
    Service Earthworks, Systematization, Exterior Arrangements
    Division Utilities
    Customer

  • Agigea Bridge

    Agigea Bridge over the Danube – Black Sea Canal

    Location Agigea, Constanta
    Status Finalized
    Works Entire execution of the Bridge
    Divizion Apolodor
    Beneficiary CNAPM

    Cable – stayed bridge, having an opening of 180 m, 420 m length and two viaducts of 240 m each.

    Two piles, having a 65 m height, sustain the bridge with steel cables.

    It has the longest opening in Romania between piles (200 m), and together with the viaducts, it forms a connection of 907 m between the two banks of the canal.



    Installation of the second deck at the Agigea Bridge

    https://www.youtube.com/watch?v=URcsrKftCpIhttps://www.youtube.com/watch?v=ZdX2Bh5Qej4








  • Pod Agigea peste canalul Dunare – Marea Neagra

    Podul Agigea peste canalul Dunare – Marea Neagra

    Locatie Agigea, Constanta
    Status Finalizat
    Servicii Antrepriza Generala
    Divizia Apolodor
    Beneficiar CNAPM

    Pod hobanat, cu o deschidere de 180 m, lungime de 420 m si doua viaducte de 240 m fiecare.

    Doi piloni, inalti de 65m, sustin prin hobane (cabluri de otel) acest Pod.

    Podul are cea mai mare lungime din Romania intre 2 piloni (200m) si, impreuna cu viaductele, formeaza o punte de 907m lungime intre cele doua maluri ale Canalului.

    Evolutia lucrarii in imagini


























































































    Montarea celui de-al doilea tablier la
    Podul de la Agigea

    https://www.youtube.com/watch?v=URcsrKftCpIhttps://www.youtube.com/watch?v=ZdX2Bh5Qej4








  • AGIGEA BRIDGE – Placing the last deck of the bridge

    https://www.youtube.com/watch?v=ZdX2Bh5Qej4Placing the last deck of the Agigea Bridge was performed in special condition, with very strong wind.

  • POD AGIGEA – Montarea ultimului tablier

    Montarea ultimului tablier al Podului Agigea s-a facut in conditii speciale, de vant puternic.

  • Mutarea statuilor de la Universitate

    Mutarea statuilor de la Universitate

    Spiru Haret, Gheorghe Lazăr, Mihai Viteazul şi Heliade Rădulescu au revenit sâmbătă pe locul lor iniţial de la Universitate. Operaţiunea de mutare a început la 5:30 dimineaţa, prima statuie fiind cea a lui Spiru Haret, având o înălţime de 9,5 metri şi o greutate de 124 tone. Au urmat pe rand, Gheorghe Lazăr (8.5 m, 117 t), Mihai Viteazul (8 m, 97 t), si Heliade Rădulescu (9 m, 104 t).

    ANUL 2012

    Numar 4 statui

    BENEFICIAR …

    Pentru transport, care a durat aproximativ o oră pentru fiecare statuie, s-a folosit un treiler modular special adus din Austria, iar pentru încărcare şi descărcare, două macarale speciale de 500 si 250 tone. La operaţiune a participat o echipă de aproximativ 100 oameni, care s-au coordonat perfect.

    02  

    Statuia Gheorghe Lazăr

    Ion Georgescu –Gheorghe Lazăr, marmură, 1886


    01  

    Statuia Mihai Viteazul

    Albert Ernest Carrier-Belleuse, Mihai Viteazul, statuie ecvestră, bronz, 1874

    03  

    Statuia Ion Heliade Radulescu

    Ettore Ferrari – Ion Heliade Rădulescu, marmură, 1881

    04  

    Statuia Spiru Haret

    Ion Jalea – Spiru Haret, marmură, 1936

    1
    8
    7
    6
    5
    4
    3
    2

    Anterioară
    Următoare

  • Relocating the statues from the University Square

    Relocating the statues from the University Square

    Spiru Haret, Gheorghe Lazar, Mihai Viteazul and Heliade Radulescu returned to their original place at the University on Saturday. The moving operation started a 5:30 in the morning, the first statue being that of Spiru Haret, with a height of 9.5 meters and 124 tons weight. It was followed by Gheorghe Lazar (8.5 m, 117 t), Mihai Viteazul (8 m, 97 t) and Heliade Radulescu (9 m, 104 t).

    ANUL 2012

    Numar 4 statui

    BENEFICIAR …

    For the transport, which lasted about an hour for each statue, a special modular trailer from Austria was used, and for loading and unloading, two special cranes of 500 and 250 tons. The operation was attended by a team of 100 people, who coordinated perfectly together.

    02  

    Gheorghe Lazar Statue

    Ion Georgescu –Gheorghe Lazăr, marble, 1886


    01  

    Mihai Viteazul Statue

    Albert Ernest Carrier-Belleuse, Mihai Viteazul, statuie ecvestră, bronz, 1874

    03  

    Ion Heliade Radulescu Statue

    Ettore Ferrari – Ion Heliade Rădulescu, marble, 1881

    04  

    Spiru Haret Statue

    Ion Jalea – Spiru Haret, marble, 1936

    1
    8
    7
    6
    5
    4
    3
    2

    Anterioară
    Următoare

  • Relocating the statues from the University Square

    Spiru Haret, Gheorghe Lazăr, Mihai Viteazul şi Heliade Rădulescu au revenit sâmbătă pe locul lor iniţial de la Universitate.

    Operaţiunea de mutare a început la 5:30 dimineaţa, prima statuie fiind cea a lui Spiru Haret, având o înălţime de 9,5 metri şi o greutate de 124 tone. Au urmat pe rand, Gheorghe Lazăr (8.5 m, 117 t), Mihai Viteazul (8 m, 97 t), si Heliade Rădulescu (9 m, 104 t). Pentru transport, care a durat aproximativ o oră pentru fiecare statuie, s-a folosit un treiler mlodular special adus din Austria, iar pentru încărcare şi descărcare, două macarale speciale de 500 si 250 tone. La operaţiune a participat o echipă de aproximativ 100 oameni, care s-au coordonat perfect.

    1
    8
    7
    6
    5
    4
    3
    2

    Previous
    Next

  • Agigea Bridge – Pile 1

    Agigea BridgeThe reinforcing of Pile 1 was finalized on January 18, 2012, continuing with the concrete pouring works and other specific works.

    Location Agigea, Port Contstanta
    Status Completed
    Works Entire execution of the Bridge
    Division Apolodor
    Beneficiary
    CNAPM