Categorie: Agigea bridge
-
AGIGEA BRIDGE – Placing the last deck of the bridge
https://www.youtube.com/watch?v=ZdX2Bh5Qej4Placing the last deck of the Agigea Bridge was performed in special condition, with very strong wind.
-
Placing the first deck at Agigea Bridge – right shore
Agigea Bridge over the Danube – Black Sea Canal – On Sunday, July 28, 2013, the first section of the Bridge deck was installed over the Danube – Black Sea Canal, located in the Constanta Port area. It has the longest opening in Romania between piles (200 m), and together with the viaducts, it forms a connection of 907 m between the two banks of the canal.
Location Agigea, Constanta
Status Finalized
Works Entire execution of the Bridge
Divizion Apolodor
Beneficiary CNAPMhttp://www.youtube.com/watch?v=uugGT6bYalU&
-
Montarea primului tablier la Podul Agigea – culeea mal drept
Podul de la Agigea – Duminica, 28 iulie 2013, s-a montat primul tronson din tablierul Podului peste Canalul Dunare – Marea Neagra, situat in zona Portului Constanta. Podul va avea cea mai mare lungime din Romania intre 2 piloni (200m) si, impreuna cu viaductele, vor forma o punte de 907m lungime intre cele doua maluri ale Canalului. Doi piloni, inalti de 65m, vor sustine prin hobane (cabluri de otel) acest Pod.
Locatie Agigea, Port Contstanta
Status Finalizat
Servicii Infrastuctura, Terasamente, Sistematizare, Transporturi speciale, Macarale
Divizia Edilitare
Beneficiar














































