Categorie: Demolition

  • Demolition IRA Grivita

    Location Bucharest
    Status Completed
    Service Demolitions
    Division Apolodor Demolitions
    Customer Factory IRA Grivita

    The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days. The demolition and disposal works were completed in January 2010 in conditions of maximum safety, without shocks, vibrations or heavy parts fallen from height. Throughout the works there a water jet was intensively used to largely reduce the dust resulted from demolition.

    For the demolition a very large Liebherr R 954 excavator with a 28 m long jib and demolition hydraulic shears were used.

    The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days.







  • Demolare Stadionul National “Lia Manoliu”

    Locatie Bucuresti
    Status Finalizat
    Servicii Demolari
    Divizia Demolari
    Beneficiar Max Boegl – Astaldi

    Lucrarile de demolare executate prin implozie şi metoda mecanică pentru modernizarea Stadionului.

    Demolare Mecanica cu
    Foarfeca, Lia Manoliu 1395






  • Demolarea Casei Radio

    Proiectul a inclus lucrari de demolare prin implozie atat la exteriorul cladirii, cat si in structura interioara a acesteia, lucrari de demolare mecanica a fatadei, terasamente si taieri diamantate.

    Locatie Bucuresti
    Status Finalizat
    Servicii Demolare mecanica, Demolare prin implozie
    Beneficiar Dambovita Center

    Au fost luate masuri speciale de siguranta, avand in vedere locatia centrala a proiectului.


    Pentru cladirea puternic armata, construita in timpul regimului comunist, s-a folosit o cantitate impresionanta de explozibil, impreuna cu o pregatire minutioasa a demolarii.

    Structurile interioare ale cladirii au fost demolate fara a afecta structura fatadelor.

    150 000 mc de terasamente si 60 000 mc volum demolare.