Location Bucharest, city center
Status Finalized
Works Infrastructure, Earthworks, Systematization, Special transport, Cranes
Location Bucharest, city center
Status Finalized
Works Infrastructure, Earthworks, Systematization, Special transport, Cranes
“Crucea Secolului” – After a week of preparation, the monument was moved on Sunday from Charles de Gaulle Square, in the roundabout at the intersection of Aviatorilor Bd / Beijing Bd.
The operation started at 7:20 and ended at 9:18, with a team of 60 people (engineers, special cutters, crane operators, drivers, carpenters). A 55 tones Grove crane and a trailer were used for the transport.
Location Bucuresti
Status Finished

24-Amintire-din-Parcul-Izvor

25-Echipa

1-Pregatirea-carcaselor-de-armare

23-Asezarea-pe-noua-fundatie

22-Mihai-Viteazu-la-destinatie

20-Nici-un-strop-nu-s-a-varsat

21-De-ce-te-au-legat,-frate

19-Spiru-Haret-contempland

17-Gh-Lazar-pe-Bdul-Bratianu

18-Gh-Lazar-in-Piata-Unirii

16-Dupa-mine!

14-Mihai-Viteazu-plecand-din-Piata-Universitatii

15-Inainte-spre-Casa-Poporului

13-Heliade-Radulescu-pe-Bdul-Bratianu

11-Fundatia-dupa-taierea-cu-lant-diamantat

12-Gata-de-plecare

10-Asezarea-pe-treiler

8-Rotirea

9-Asezarea-pe-trriler

6-Taietura-cu-lant-diamantat-de-sub-statui

7-Ridicarea

5-Inainte-de-ridicare-se-verifica-taietura

2-Carotele-inainte-si-dupa-betonare

3-Carote-armate

4-Cusca-metalica
The chimneys of the Oltenita Power Plant – the three towers of the former thermal plant of Oltenita city were demolished by controlled implosion.
The difficulty of the work was represented by the fact that the three towers, having heights of 80 meters, 60 meters, respectively 40 meters, made of concrete, had another brick tower inside. 78 kg of explosive were used for the demolition and special safety measures were taken.
Location Oltenita
Status Finished
Paroseni – Demolition of the chimney from Paroseni Thermal Power Plant, APOLODOR brand technology in Romania.
Location Paroseni
Status Completed
Service Demolitions
Division Apolodor Demolitions
Customer Termocentrala Paroseni
The work was performed according to a technology introduced in Romania by our company since 1998.
Considering the height of the stalk (120 m) and the fact that there were thermal power station plants in operation very close to it, we have chosen the method of fine demolition, piece by piece, without disrupting their activity. There for, we used the Atlas Copco 2100 hydraulic shears, mounted on a Liebherr LTM 1500 crane with a 150 m jib, and driven by a large excavator Liebherr R 954, by the extension of the hydrostatic transmission pipelines. A transmission system for the images captured by a video camera placed on top of stalk helped the operator at the ground to drive the hydraulic shears with maximum precision.
The operation lasted 30 days and represented the most efficient method of demolition for a structure of such a height, being achieved in a very short time, without vibrations and disturbance of the activity within an area of 25 m, and in conditions of maximum safety.
Grivita IRA Factory – The former wagon repair factory IRA Grivita was mechanically demolished in just 4 days.
Location Bucharest
Status Completed
Service Demolitions
Division Apolodor Demolitions
Customer Factory IRA Grivita
The demolition was completed in January 2010 in conditions of maximum safety, without shocks, vibrations or heavy parts fallen from height. Throughout the works we intensively used a water jet in order to reduce the dust resulted from demolition.
The equipment used was a very large Liebherr R 954 excavator with a 28 m long jib and demolition hydraulic shears.
ELECTROAPARATAJ – The demolition started at the end of March and will be completed at the beginning of August, all buildings inside Electroaparataj area being mechanically demolished. For the demolition of the former Electroaparataj electrical and electronic products factory, the full range of excavators is employed, from the small IHI 17 used for the demolition of the inner masonry to the Liebherr R 954 excavator. The total volume to be demolished is 40,000 cubic meters.
Location Bucharest
Status Complete
Service Demolitions
Division Apolodor Demolitions
Customer
OBOR Market – After the demolition of the old market, the construction works at the new Obor Market started; it is a multifunctional building with five trunks and two basements and a total built area of 8350 sq.m. Starting in November 2009, when works began, until now, over 8000 cubic meters of concrete have been cast, the volume increasing in the last months, up to 2000 cubic meters of concrete cast only in April 2010. The works will be completed at mid June 2010.
Location Bucharest
Status Completed
Service Demolitions, Civil Works
Division Apolodor Civil Works
Customer Obor Market
Proiectul a inclus lucrari de demolare prin implozie atat la exteriorul cladirii, cat si in structura interioara a acesteia, lucrari de demolare mecanica a fatadei, terasamente si taieri diamantate.
Locatie Bucuresti
Status Finalizat
Servicii Demolare mecanica, Demolare prin implozie
Beneficiar Dambovita Center