Finalizing the new pedestrian underpass – Press Square Underpass
Press Square Underpass March 21 – 22, 2015 – The precast concrete elements placing was performed within a very short period of time, in order to avoid traffic restriction in the area. The works were performed in two stages, after each one, the road being rebuilt and opened for circulation. Two high tonnage cranes were used in order to lift and place each precast concrete element (over 150 tones).
Location Bucharest, City Center
Status Finalizat
Works General Enterprise
Beneficiary Bucharest Municipality -
Demolarea Casei Radio
Proiectul a inclus lucrari de demolare prin implozie atat la exteriorul cladirii, cat si in structura interioara a acesteia, lucrari de demolare mecanica a fatadei, terasamente si taieri diamantate.
Locatie Bucuresti
Status Finalizat
Servicii Demolare mecanica, Demolare prin implozie
Beneficiar Dambovita Center
Au fost luate masuri speciale de siguranta, avand in vedere locatia centrala a proiectului.

Pentru cladirea puternic armata, construita in timpul regimului comunist, s-a folosit o cantitate impresionanta de explozibil, impreuna cu o pregatire minutioasa a demolarii.
Structurile interioare ale cladirii au fost demolate fara a afecta structura fatadelor.
150 000 mc de terasamente si 60 000 mc volum demolare.