For the Bucharest Ring Road, lot 2 km 69+000 – km 85+300 of the South Ring, Apolodor started the earthworks, having a volume of over 370 000 cubic meters.
For the Bucharest Ring Road, lot 2 km 69+000 – km 85+300 of the South Ring, Apolodor started the earthworks, having a volume of over 370 000 cubic meters.